File 1.11: Kapoor Lumber Co. [1928-1947]
Itemized list of materials to be loaded into train cards in Blanchard, Washington, arranged by Mayo Singh, to be delivered to Kapoor Lumber Co. Ltd. Total price is $4000.00, with $2000.00 payable from the Treasurer of the Star Machinery co.